The Bangkok Transit System (BTS)
BTS an elevated mass rapid transit, started its operation on 5 December 1999. It comprises two route. It is planned to extend both routes in the future. More information is presented on www.bts.co.th
The Metropolitan Rapid Transit (MRT)
MRT, the first of the underground transit system of Thailand , which connects with the BTS System.
More information is presented on www.bangkokmetro.co.th/
|